3736 E153rd Flooring Installation

Notify me when this product is available:

Flooring installation:

Removal and haul away of existing quarter round

Install Bellaire Hawthorne Gray LVP throughout kitchen, hallway, and bathroom

Undercut door jambs and install flooring underneath jambs

Install shoe molding in areas where existing baseboard exists

Caulk around shoe molding and cover nail holes

Install universal transition strips in doorway of bedrooms, living room, and kitchen entry door

 

 

Bathroom:

Remove toilet

Replace subfloor with new 3/8” plywood subfloor

Set new toilet and flange

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)