19518 Raymond Change Order 2

Exterior:

  • Install Hand Rail on back Deck
  • Remove and install new casing around garage door

 

Interior: 

  • Front bedroom door: remove, shave, paint
  • Back bedroom window repair lock and lift
  • Living room window repair
    • Windows may need to be replaced.
    • Best level effort will be made to make repairs, however the windows in the house are severely deteriorated
  • Install CO detectors on every floor (3)
  • Front door adjustment to close
  • Install new hot water tank
  • Adjust basement bathroom door
  • Install doorbells
  • Cap off gas valve
  • Replace gas line for stove

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)